Plant Materials and Equipment Testing Procedure
Where no specific test is specified then
the various items of plant, materials and equipment shall be tested in
accordance with the appropriate IEC standard. Where no appropriate standard is
available, tests shall be carried out in accordance with the maker’s standard
practice, subject to the prior approval of the Engineer.
In all cases, works tests shall include electrical mechanical and hydraulic tests in addition to any tests called for by the Engineer to ensure that the plant being supplied fulfill the requirements of the Specification.
In all cases, works tests shall include electrical mechanical and hydraulic tests in addition to any tests called for by the Engineer to ensure that the plant being supplied fulfill the requirements of the Specification.
If considered necessary by the Engineer
any multi-part assemblies shall be fully erected in the Works prior to packing
and dispatch to Site.
All tests to be performed during
manufacture, fabrication and inspection shall be agreed with the Engineer prior
to commencement of the work. The inspection schedule included in the Schedules
of Miscellany shall be used for this purpose. The Service-provider shall
prepare the details of the schedule and submit these to the Engineer for
approval.
It must be ensured that adequate
relevant information on the design, code/standard employed, the
manufacture/fabrication/assembly procedure and the attendant quality control
steps proposed are made available to the Engineer. The Engineer will mark in
the appropriate spaces his intention to attend or waive the invited tests, or
inspections.
A minimum of 14 days notice in writing,
of the readiness of plant for test or inspection shall be provided to the
Engineer by the Service-provider in accordance with the following:
Following Information for Manufacturer works testing
The Service-provider shall submit to the
Engineer sequentially numbered applications for inspection which shall contain
the following information.
Contract number;
Contract title;
Service-providers Name;
Inspection application number;
Manufacturers name, address, telephone
and telex numbers, plus name of manufacturers staff responsible for the testing
and manufacturer’s works order number;
Location of tests;
Date of tests;
Description in full of Plant offered for
inspection (Service-providers order references alone are insufficient and
unacceptable);
Section of the Works which Plant is allocated;
Schedule of tests be followed and
standard to be applied;
List of the Engineers approved drawing
numbers appropriate to the Plant offered;
Sub-order number;
The subject items should remain
available for Engineers inspection and test up to a minimum of 10 days beyond
the agreed date of witnessing the test;
Sponsored:
Sponsored:
Every facility in respect of access,
drawings, instruments, and manpower shall be provided by the Service-provider
and his Sub-Service-provider to enable the Engineer or his designated
representative to carry out the necessary inspection and testing of the Plant.
No equipment shall be packed, prepared
for shipment, or dismantled for the purpose of packing for shipment, unless it
has been satisfactorily inspected, and approved for shipment, or alternatively
inspection has been waived. The Service-provider shall request permission to
dispatch in writing.
Tests should be Carry-out by
Service-Provider
Functional electrical, mechanical and
hydraulic tests shall be carried out on the completed plant after assembly in
the Works. The extent of these tests and method of recording the results shall
be submitted to, and agreed by, the Engineer in sufficient time to enable the
tests to be satisfactorily witnessed, or if necessary for any changes required
to the proposed programme of tests to be agreed.
All instruments and apparatus used in
the performance of the tests shall be to the approval of the Engineer, and, if
required by the Engineer, shall be calibrated to an agreed standard at the
National Physical Laboratories or equivalent centre and approved by the
Engineer.
The cost of carrying out such
calibrations shall be borne by the Service-provider in all cases.
The Engineer reserves the right to visit
the Service-provider’s Works at any reasonable time during manufacture of the
items of plant and to familiarize him with the progress made and the quality of
the work to date.
Tests and Testing Materials
Requirements for the testing of castings
and forgings and weld procedures are derailed in this Specification.
Representative samples of all plates, bars and pipes etc. Which form components
of the plant shall be tested as required by the relevant standard or code or at
the request or the Engineer.
All test pieces shall be prepared and
supplied by the Service-provider at his own cost. If any test piece fails to
comply with the requirements of the specification ions for the material in
question, the Engineer may reject the whole of the material represented by that
test piece.
All-import forgings are to be examined
jointly at the maker’s works by the Engineer with the representatives of the
manufacturers during forging and heat treatment.
Test Records and Test Certificates
Within 30 days of the completion of any
test, four sets of all principal test records, test certificates and correction
and performance curves for the Plant and its component parts shall be supplied
to the Engineer’s Head office.
These test records, certificates and
performance curves shall be supplied for all tests, whether or not they have
been witnessed by the Engineer or his Representative. The information given on
such test certificates and curves shall be sufficient to identify the material
or equipment to which the certificate refers and should also bear the contract
reference title. It shall be possible to identify the item of plant to which a
specific test certificate refers, including those of sub-components and the
specific site for which the item is allocated.
Service-providers order numbers or
drawing reference numbers are not sufficient for this purpose without a
description of the plant involved.
Sponsored:
Sponsored:
Test certificate shall provide full
details of the measurements of their tolerances, and actual test values
obtained. Certificates simply stating phrases such as ‘Fussed’ or ‘tested in
Accordance With are not acceptable.
When all equipment has been tested the
test certificates from all Works and Site tests shall be compiled by the Service-provider
into volumes and bound in an approved form complete with index and included in
the appropriate Operation and Maintenance manuals.