Considering the Facilities and Transportation System in Bangladeshi Construction Sites.
Chittagong is the principal port of entry for material to Bangladesh. Inland transport from Chittagong to Dhaka area can be by barge, rail or road; barge and rail being the more usual methods employed.
The Contractor is
responsible for performing all unloading, inland transportation and obtaining
all approvals and consents etc. necessary for the movement of plant and
contractors equipment from the port to the site.
All necessary access roads,
jetties or off-loading points etc. required for the transport of the plant etc.
to site will be the Contractors responsibility.
Land ports of Bangladesh are located at land and inland water (river) boundaries with India, Nepal, Bhutan and Myanmar, which have varying needs and requirements based on their location. Most of the inland port in Bangladesh with neighbour country India, the list of major inland port in bangladesh is as below:
Sponsore by-
Land ports of Bangladesh are located at land and inland water (river) boundaries with India, Nepal, Bhutan and Myanmar, which have varying needs and requirements based on their location. Most of the inland port in Bangladesh with neighbour country India, the list of major inland port in bangladesh is as below:
Sponsore by-
LC Station
|
District
|
District on opposite
side
|
Benapole
|
Jessore
|
24 Pargana
|
Teknaf
|
Cox's Bazar
|
Mundu, Myanmar
|
Banglabandha
|
Panchagar
|
Jalpaiguri
|
Sonamasjid
|
Chapai Nawabgaj
|
Maldaha
|
Hilli
|
Diajpur
|
West Dinajpur
|
Bhomra
|
Satkhira
|
24 Pargana
|
Darshana
|
Chuadanga
|
Nadia
|
Birol
|
Dinajpur
|
Gaur
|
Burimari
|
Lalmonirhat
|
Mekhaljigonj
|
Tamabil
|
Sylhet
|
Shilong
|
Haluaghat
|
Mymensing
|
Tura
|
Akhaura
|
Brahmanbaria
|
Agartala
|
Bibirhazar
|
Comilla
|
Agartala
|
Nakugaon
|
Serpur
|
Dalu (Meghalaya)
|
Biloniya
|
Feni
|
Biloniya
|
Gobarakura and
Karitali
|
Mymensingh
|
Gachuyapara
(Meghalaya)
|
Where heavy loads are to be
moved the Contractor shall be responsible for performing surveys of the routes
to ensure that all portions have adequate load-bearing capacity.
A comprehensive method statement shall be submitted to
the Engineer detailing the proposed transport route(s) and requirements.
Plans indicating all bridges, ducts, culverts, railway crossings, overhead lines, water mains etc. their load bearing capacity or clearances as appropriate shall be given together with proposed means of achieving the transportation requirements.
Any reinforcement, strengthening, modifications or temporary works required to obtain the necessary capacity shall be the responsibility of the Contractor. The cost of the above is to be included in the Tender price.
Plans indicating all bridges, ducts, culverts, railway crossings, overhead lines, water mains etc. their load bearing capacity or clearances as appropriate shall be given together with proposed means of achieving the transportation requirements.
Any reinforcement, strengthening, modifications or temporary works required to obtain the necessary capacity shall be the responsibility of the Contractor. The cost of the above is to be included in the Tender price.
No plant is to be consigned
to Bangladesh by airfreight without the prior written approval of the Employer.
No comments:
Post a Comment
WAZIPOINT:
Thank you very much to visit and valuable comments on this blog post. Keep in touch for next and new article. Share your friends and well-wisher, share your idea to worldwide.