Fig- Cable Testing Pie |
Cable and Cable Accessories Packing and Post Landing
Inspection Procedure for Underground Cable Project
The Cable Drum shall be covered by
steel sheet to protect from external thrust. All goods are to be export-packed
and properly protected for shipment, rough transportation and storage.
Each set of jointing kits shall be
sealed in waterproof polyethylene bag having a silica gel packet placed inside
the unit and then packed in polystyrene foam gasket closed by self adhesive
tape. Rating of the unit shall be marked
by marker pen or label on the foam for easy identification.
Maximum 10 (ten) sets of Jointing kits
are allowed to pack into separate wooden packaging box lined with heavy gauge
polyethylene.
Between the cartoons, a suitable
packing material for protection and preventing their movement should be used.
Each box shall have an individual waterproof, transparent and heavy gauge
polyphone wrapper and bitumen paper and then packed into a five-ply paper
carton for Boxes. Silica gel shall be provided inside the each polyphone
wrapper. The packing case should be able to withstand accidental direct exposure
to weather for reasonable period.
The supplier shall be responsible for damages
due to inadequate packing. A packing list showing the contents of each packing
shall be enclosed in a waterproof envelope secured to the outside of the
packing case. A copy of the packing list shall also be enclosed the package.
All packages imported are liable to be
opened for Customs examination and packing shall therefore be designed to
facilitate opening and re-packing thereafter.
A red band (20cm. wide) shall be painted
all around each package. Each package shall the following information printed
on it in bold letters:
-
Name of supplier.
-
Port of Loading
-
Port of destination.
-
Name of Consignee.
-
Contract Number.
-
Brief description of Stores.
-
Number of Packages.
-
Gross and net weight.
-
Measurements.
In addition, each package shall be
clearly marked or stenciled in red on two sides, the shipping mark, "Employer, Country" inscribed
within a triangle mark as shown below:
The Shipping Mark
On the other two sides’s arrow marking
with the wording "THIS SIDE UP" and "FRAGILE" shall be
clearly marked or stenciled to indicate the face of the package to be kept
upward.
Inspection and Testing
The Purchaser shall have the right to
inspect/test the goods/materials to confirm their conformity to the
specification.
The Purchaser shall be entitled at all
reasonable time during manufacture to inspect, examine and test of
goods/materials at the manufacturers' premises, workmanship and performance.
The Supplier shall, after consulting
the purchaser, give the Purchaser reasonable notice in writing of the date on
and the place at which any material or equipment will be ready for resting as
provided in the contract and unless the purchaser shall attend at the place so
named on date, which the supplier has stated in his notice, the supplier may
proceed with the tests, which shall be deemed to have been made in the
purchaser's presence, and shall forthwith forward to the purchaser duly
certified copies of test readings.
When the purchaser intends to attend
the test he shall promptly inform the supplier accordingly in writing, so the
supplier can take action. The purchaser shall give the supplier timely notice
in writing of his intention to attend the test.
Where the supplier provides for tests
on the premises of the supplier or of any manufacturer of the supplier, except
where otherwise specified, shall provide free of charge such assistance, labor,
materials, electricity, fuel, stores, apparatus and instruments as may be
requisite and as may be reasonably demanded to carry out such test efficiently.
This test shall be performed as per relevant IEC/BS Standard or equivalent and
routine tests as agreed upon.
As and when the purchaser is satisfied
that any materials/equipment shall have passed the tests referred to in this
clause, purchaser shall notify the contractor in writing to that effect.
Should any inspected/tested goods fail
to conform to the specification, the Purchaser shall have the right to reject
any of the items or complete batch if necessary. In that case Supplier has to
replace the Equipment and to make good of them without any financial
involvement to the Purchaser.
Nothing in this clause shall in any way
release the supplier from any warranty or other obligations under the contract.
Post Landing Inspection (PLI)
Post landing inspection shall be done
by a PLI committee of Employer immediately after arrival of the goods at the
designated store. The program of such inspection shall be intimated to the
representative of Supplier. The PLI committee in its report shall mention the
exact/assessed quantity of goods. The Post Landing Inspection of goods shall
generally cover the following, but not limited to it-
(i) Visual Inspection of goods;
(ii) Conformance with approved drawings with respect to dimensions/type/size.
(iii) Quantity of supplied goods.
Hi my family member! I want to say that this post is awesome, nice written and come with approximately all
ReplyDeletevital infos. I'd like to see extra posts like this .
Why visitors still make use of to read news papers when in this
ReplyDeletetechnological world all is available on net?
Attractive section of content. I just stumbled upon your web site
ReplyDeleteand in accession capital to assert that I get in fact enjoyed account your blog posts.
Any way I'll be subscribing to your feeds and even I achievement you access consistently
rapidly.