Horizontal Directional Drilling (HDD) Works for Power Cable Installation in Bangladesh
Horizontal Directional Drilling (HDD) is a trenchless method commonly used for installing underground utilities, including power cables, beneath obstacles such as roads, rivers, or existing infrastructure. It is particularly suited for urban and environmentally sensitive areas where traditional trenching is impractical or disruptive.
We Ensure the Key Phases of HDD for Power Cable Installation
1. Planning and Design
- Survey and Geotechnical Investigation: Analyze the ground conditions (soil type, rock layers, groundwater levels).
- Route Design: Select an optimal path considering the shortest route, minimum bends, and avoiding underground obstructions.
- Permitting: Obtain required approvals and environmental clearances from authorities.
2. Setup and Preparation
- Equipment Mobilization: Bring HDD rigs, drill rods, mud mixing systems, and other machinery to the site.
- Site Preparation: Secure entry and exit pits, ensuring access to machinery and safety for workers.
3. Drilling Process
- Pilot Hole Drilling: Drill a small-diameter hole along the designed path using a steerable drill bit.
- Tracking and Guidance: Use tracking systems to ensure the drill follows the planned alignment.
- Enlarging the Hole (Reaming): Gradually increase the pilot hole size to accommodate the power cable.
4. Cable Pullback
- Attach the power cable to the reamer or a pulling head.
- Pull the cable through the drilled hole while ensuring no damage occurs.
5. Backfilling and Restoration
- Fill the pits and restore the surface to its original or required condition.
- Dispose of or recycle drilling fluids responsibly.
We care and Optimize the Advantages of HDD for Power Cable Installation
- Minimal Surface Disruption: Ideal for urban areas, highways, and water crossings.
- Environmentally Friendly: Reduces ecological impact compared to open trenching.
- Flexibility: Can navigate beneath obstacles and access hard-to-reach locations.
- Cost-Effective in the Long Term: Reduces restoration costs and downtime.
We Care About HDD Works Challenges and Considerations
- Soil Conditions: HDD may struggle in very hard rock or loose sandy soils.
- Cable Protection: Ensure proper sheathing and support to avoid damage during installation.
- Skill Requirements: Requires experienced operators and precise planning.
- Drilling Fluids Management: Proper disposal of drilling mud to avoid environmental issues.
Our Completed HDD Works for Power Cable Installation
We have completed more than 200 Km of Horizontal Directional Drilling (HDD) works for underground power cable networks in Bangladesh.
We have pulled 230kV, 132kV, 33kV, and 11kV underground power cables through HDPE Pipe for crossing rivers, canals, Rai,l, and Highway crossing; also crossing the busy and crowded city area for cable installation.
Recently, we have done DPDC, DESCO, and PGCB 132kV, 33kV and 11kV underground cable installation works where used more than 200 Km HDPE pipes for HDD works.
Would you like assistance with any specific aspect of HDD for power cable installation, such as equipment selection, project planning, or technical details?
E-mail: gmprotec@gmail.com
No comments:
Post a Comment
WAZIPOINT:
Thank you very much to visit and valuable comments on this blog post. Keep in touch for next and new article. Share your friends and well-wisher, share your idea to worldwide.